Contributed by ANG PECK HAI, THNG CHYE HOCK
Present situation:
The current situation is rain water seepage through inside building corridor towards infra office wooden door entrance and is causing water ponding along the corridor, the staff who are going to enter the office entrance will feel very uncomfortable to do so. The flooring is also very slippery and safety is the major concern.
Improvement:
The implementation solution is to Install thick Transparent PVC plastic cover to prevent rain water seepage, the safety issue can then be eliminated out.
Comments
Post a Comment